Projects
-
2025
LEDNeCo: Low Energy Deep Neurocomputing, GACR, Standardní projekty, 25-15490S, start: 2025-01-01, end: 2027-12-31, running
-
2024
Hardware-Aware Machine Learning: From Automated Design to Innovative and Explainable Solutions, GACR, Standardní projekty, GA24-10990S, start: 2024-01-01, end: 2026-12-31, running
-
2023
Application-specific HW/SW architectures and their applications, BUT, Vnitřní projekty VUT, FIT-S-23-8141, start: 2023-03-01, end: 2026-02-28, running
-
2022
AppNeCo: Approximate Neurocomputing, GACR, Standardní projekty, GA22-02067S, start: 2022-01-01, end: 2024-12-31, running
-
2021
Analysis of the applicability of Angle of Arrival technology in practice, ADWITECH, start: 2021-10-01, end: 2022-02-28, completed
Automated design of hardware accelerators for resource-aware machine learning, GACR, Standardní projekty, GA21-13001S, start: 2021-01-01, end: 2023-12-31, completed
-
2020
Bio-inspired methods for resource aware computer system design, EU, European Cooperation in Science and Technology (COST), start: 2020-09-29, end: 2024-09-28, running
Návrh, optimalizace a evaluace aplikačně specifických počítačových systémů, BUT, Vnitřní projekty VUT, FIT-S-20-6309, start: 2020-03-01, end: 2023-02-28, completed
-
2019
Designing and exploiting libraries of approximate circuits, GACR, Standardní projekty, GA19-10137S, start: 2019-01-01, end: 2021-12-31, completed
-
2018
Advanced Methods of Nature-Inspired Optimisation and HPC Implementation for the Real-Life Applications, MŠMT, INTER-EXCELLENCE - Podprogram INTER-COST, LTC18053, start: 2018-06-01, end: 2020-02-29, completed
-
2017
Pokročilé paralelní a vestavěné počítačové systémy, BUT, Vnitřní projekty VUT, FIT-S-17-3994, start: 2017-03-01, end: 2020-02-29, completed
-
2016
IT4Innovations excellence in science, MŠMT, Národní program udržitelnosti II, LQ1602, start: 2016-01-01, end: 2020-12-31, completed
Relaxed equivalence checking for approximate computing, GACR, Standardní projekty, GA16-17538S, start: 2016-01-01, end: 2018-12-31, running
-
2014
Advanced Methods for Evolutionary Design of Complex Digital Circuits, GACR, Standardní projekty, GA14-04197S, start: 2014-01-01, end: 2016-12-31, completed
Architektury paralelních a vestavěných počítačových systémů, BUT, Vnitřní projekty VUT, FIT-S-14-2297, start: 2014-01-01, end: 2016-12-31, completed
-
2012
Verifikace a optimalizace počítačových systémů, BUT, Vnitřní projekty VUT, FIT-S-12-1, start: 2012-01-01, end: 2014-12-31, completed
-
2011
Advanced secured, reliable and adaptive IT, BUT, Vnitřní projekty VUT, FIT-S-11-1, start: 2011-01-01, end: 2013-12-31, completed
The IT4Innovations Centre of Excellence, MŠMT, Operační program Výzkum a vývoj pro inovace, ED1.1.00/02.0070, start: 2011-01-01, end: 2015-12-31, completed
-
2010
Natural Computing on Unconventional Platforms, GACR, Standardní projekty, GAP103/10/1517, start: 2010-01-01, end: 2013-12-31, running
Secured, reliable and adaptive computer systems, BUT, Vnitřní projekty VUT, FIT-S-10-1, start: 2010-03-01, end: 2010-12-31, completed
-
2009
Mathematical and Engineering Approaches to Developing Reliable and Secure Concurrent and Distributed Computer Systems, GACR, Doktorské granty, GD102/09/H042, start: 2009-01-30, end: 2012-12-31, completed
-
2007
Design and hardware implementation of a patent-invention machine, GACR, Standardní projekty, GA102/07/0850, start: 2007-01-01, end: 2009-12-31, completed
Security-Oriented Research in Information Technology, MŠMT, Institucionální prostředky SR ČR (např. VZ, VC), MSM0021630528, start: 2007-01-01, end: 2013-12-31, running
Software Stabilisation of Image Signal from Camera System, HS1470031, start: 2007-01-04, end: 2007-07-15, completed
Technical Evaluation of Biometric Systems, NBÚ, Projekty řeší problematiku výzkumu a vývoje v oblasti kryptografie a kryptoanalýzy s cílem zajištění kryptografických prostředků pro ochranu utajovaných skutečností., ST20072007006, start: 2007-03-27, end: 2007-12-31, completed
-
2006
Methods of polymorphic digital circuit design, GACR, Standardní projekty, GA102/06/0599, start: 2006-01-01, end: 2008-12-31, completed